
IPCQ was engaged by Arrow Energy in mid 2011 to complete protective coating upgrades to above ground pipework within two Compressed Gas Production Facilities located in the Surat Basin.
The scope of works included high pressure water washing, abrasive blasting, hand preparation and application of protective coatings to existing pipework within the facility.
To date, IPCQ has completed one of these facilities and is finalising works on the second.