Projects

  • Queensland Rail is undertaking remediation works on a series of rail bridges on the North Coast Line in Central Queensland. These works are necessary to ensure that safe, timely and adequate rail services continue to be provided to the region. IPCQ was awarded a subcontract with Princip..

  • Built in 1883 and currently operated by the Australian Maritime Safety Authority, Cape Banks Lighthouse is heritage listed and represents developments in lighthouse technology and design. IPCQ was engaged to perform remedial coating restoration of the 135 year old Lighthouse which is remotel..

  • With over 12Mm2 of carbon steel alone, DBCTM engaged IPCQ in 2017 to support and enhance the existing maintenance programme on site. IPCQ’s brief was to provide continuity and accountability to gain traction and deliver superior abrasive blasting and coating remediation works. Since o..

  • IPCQ has been contracted by Wagners to undertake insitu coating application to wharf structure including headstocks, piling and crane beams. The coating works are conducted over-water requiring impermeable encapsulation to prevent environmental contamination. As an integral infrastructure p..

  • After successfully completing the ROM Refurbishment Projects in 2014 & 2015, IPCQ was engaged in to assist with coating remediation following the CHPP Structural Steel Integrity Audit in August 2016. IPCQ and the site’s maintenance team formed a partnership to establish and impleme..

  • During 2014-2016, IPCQ were engaged by CBI Constructors to complete 18 non-cryogenic bulk storage tanks at the $37B Inpex Ichthys LNG Project located in Darwin, Northern Territory. The complex project involved both internal linings and external coatings of tanks from 4m diameter up to 60m ..

  • IPCQ completed the refurbishment and recoating of the 50,000m2 Domestic Terminal Building Roof. Our team replaced flashings, reinstated penetrations and applied a two-coat protective coating system to the roof. Our brief was to extend the life of the roof for an additional 20 years. We com..